Solar glass manufacturer Shanxi RiShengda New Energy has started a RMB 110 million technical upgrade project at its Changzhi production base.

The project will upgrade the existing 500-ton melting furnace and production lines from a ‘one furnace, four lines’ configuration to a ‘one furnace, two lines’ dual-process production model.
One production line will continue manufacturing ultra-clear rolled glass, while the second will produce substrate glass for perovskite modules together with a 100 MW integrated perovskite thin-film solar cell system.
Source:
Posted: Jul 16,2026 by Roni Peleg