Tandem PV
Tandem PV is a U.S.-based company developing and manufacturing mechanically-stacked perovskite-silicon tandem solar panels, headquartered in Fremont, California. The company's technology builds on tandem solar cell research by Stanford's Colin Bailie, and is led by CEO Scott Wharton, who joined in 2023, alongside solar industry veteran Chris Eberspacher (former CTO at Hanwha and Applied Materials SunFab).
Tandem PV's approach to manufacturing photovoltaic cells is to deposit a metal-halide perovskite solar cell, which is transparent to infrared light, over a silicon-based cell, which then absorbs that infrared energy - allowing each material to capture a different part of the solar spectrum from the same panel footprint.
The company has raised million in Series A funding and debt, together with a million California Energy Commission grant, and operates a 65,000-square-foot demonstration factory in Fremont with roughly 40 MW of nameplate capacity, producing large-format panels for customer validation and market trials. Its transparent-oxide coating capability is in-house following the acquisition of Oregon-based nexTC Corporation.
Contact information for Tandem PV
3500 Gateway Blvd
Fremont, CA 94538
United States
Tandem PV secures $7.7 million US DOE ARPA-E SCALEUP Ready award
Tandem PV has been selected for the US Department of Energy's ARPA-E SCALEUP Ready program, winning approximately $7.7 million to support the commercial scale-up and US manufacturing of its tandem technology. SCALEUP Ready is ARPA-E's "disruption wing," aimed at helping promising advanced energy technologies move from development toward market adoption and commercial deployment.
The award will support Tandem PV's Tandems for American National Dominance in Energy Manufacturing (TANDEM) project, which the company says will help move its high-efficiency tandem panels toward large-scale commercial production and support US solar PV manufacturing. Tandem PV's technology combines an ultra-thin perovskite layer with conventional silicon, a design the company says packs more power into the same panel footprint and helps lower costs; it claims up to 29.7% efficiency for its tandem modules under internal testing.
Tandem PV acquires nexTC Corporation
Tandem PV, a U.S. developer and manufacturer of high-efficiency perovskite-silicon solar panels, has announced that it has acquired nexTC Corporation, an Oregon-based developer of advanced thin-film metal oxide coating processes.
The acquisition brings nexTC’s coating technology, intellectual property, and technical expertise into Tandem PV, giving the company greater control over a critical coating process as it ramps its Fremont demonstration line and prepares for commercial-scale production. nexTC specializes in solution-based transparent oxide coatings. In tandem solar panels, these ultrathin layers modify charge transport while allowing sunlight to reach the silicon cell below. Their performance is important to module efficiency, durability and manufacturability.
Tandem PV installs perovskite-silicon panel for outdoor testing at UC Merced
TandemPV has installed one of its perovskite-silicon tandem panels atop UC Merced's Science and Engineering 2 Building for outdoor testing, installed alongside smaller Tandem PV test panels already in place, marking the start of a multi-month durability study run with UC Merced researchers.
The panel is built on Tandem PV's approach of integrating a perovskite layer into existing silicon solar manufacturing supply chains. A coating just one-hundredth the thickness of a human hair is meant to boost the panel's energy output from 24% to 30%, which the company says translates to about 30% more electricity from the same footprint compared with a typical silicon panel. Because labor and balance-of-system costs account for roughly 75% of utility-scale solar costs, generating more power per panel without a larger footprint helps bring down the overall cost of a solar installation.
Tandem PV announces 30.4% efficient perovskite/silicon demonstration module
TandemPV has announced a 30.4% efficient perovskite/silicon demonstration module, weeks after the company reported crossing 30% efficiency.
The 100 cm² mini-module, featuring the company’s proprietary 4-terminal perovskite glass layer atop a high-efficiency Maxeon IBC silicon solar cell, is now in third-party certification.
Secure your spot at Perovskite‑Connect 2026 now - prices go up at the end of May!
The countdown is on for Perovskite Connect 2026, returning to Berlin on 21–22 October 2026. If you’re planning to attend, now’s the perfect time to secure your place - as prices will be going up at the end of the month!
Join leading researchers, manufacturers, and innovators shaping the landscape of the perovskite photovoltaics field. Building on last year’s momentum, Perovskite Connect 2026 will once again unite the global perovskite community for two days of insights, networking, and progress.
Pagination
- Page 1
- Next page